Documents
Application Forms and Templates
Application Flowcharts
- Concept Grading Erosion and Sediment Control (CSC) Application
- Site Development Grading Erosion and Sediment Control (SSC) Application
- Final Grading Erosion and Sediment Control (FSC) Application
- Exemptions (Exp) and Standard Grading Erosion and Sediment Control (Std) Application
Policy Memorandums
- Policy 04.23.2015 – Expiration of SWM Grandfather Provisions (COMAR)
- Policy 05.10.2016 – Rainfall Distributions for Design Based on NOAA Atlas 14 Rainfall Depths
- Policy 06.30.2016 – Emergency “Red-Lined” Procedures and Submission Requirements for Authorized Inspections and Enforcement Programs
- Policy 10.23.2014 – Digital Archiving of Approved Project Documents
- Policy 01.2018 – Sediment Control Requirements for Solar Panel Installations
- Policy 02.2018 – Requirements for Projects in Tier II or Watersheds with TMDLs for Sediment
- Policy 01.2019 – Excavated or Partially Excavated Impoundment Facilities Adjacent to Steep Slopes
- Policy 03.2018 – Proper Installation of Baffle Boards
- Policy 01.2020 – Bouyancy Assessment of Principle Spillways
- Policy 02.2020 – District Transmission of Approvals to Regulatory Agencies
- Policy 03.2020 – Allowance for Fill Settlement in Impoundment Facilities
- Policy 01.2021 – Final Approval Requirements for Projects in Laurel
- Policy 02.2021 – Approval of Ponds in Use III Watersheds
- Policy 04.2021 – Update to Standard Erosion and Sediment Control Application
FORMS AND OTHER DOCUMENTS
MDE Dam Safety Policies
Technical Manuals and Guidance Documents
Contact Us
Urban Development and Conservation
5301 Marlboro Race Track Road
Upper Marlboro, MD 20772
Headquarters Phone Number:
301-574-5162 ext. 3
Largo Phone Number:
301-883-3265
Email: pgscd@co.pg.md.us
Program Leads
John Tarr, PE
Chief Engineer/Program Manager
Joe Bonanno, PE
Senior Staff Engineer